Buildings under construction.
The data will make the argument.
We are not publishing project sheets yet: we prefer to wait until the building is measured before telling its story.
Building projects…
The first buildings are under way. When they close, they will be published with all the data: floor area, real schedules, timber volume and lessons learned.
Notify me when they are published →Every project is published with the same structure.
It is what a structural engineer or a developer needs to decide whether the system fits. If a figure is not measured, it is not published.
Site data
Location, programme, built area, number of storeys, year and status.
Structural decision
What CLT solved, what GLT solved, spans, thicknesses and why that modulation was chosen.
Real schedules
Engineering, fabrication and assembly, measured, not estimated.
Material and carbon
Timber volume, batch origin and stored carbon, with the calculation method declared.
Team and lessons
Practice, structural engineer, contractor, and what we would do differently next time.
A·03 · Exact by nature