A·03 · ProjectsWork in progress

Buildings under construction.
The data will make the argument.

We are not publishing project sheets yet: we prefer to wait until the building is measured before telling its story.

A·03·A · PortfolioComing soon

Building projects…

The first buildings are under way. When they close, they will be published with all the data: floor area, real schedules, timber volume and lessons learned.

Notify me when they are published →
CLT structure on site
A·03·B · Anatomy of a project sheetWhat every project will show

Every project is published with the same structure.

It is what a structural engineer or a developer needs to decide whether the system fits. If a figure is not measured, it is not published.

01

Site data

Location, programme, built area, number of storeys, year and status.

02

Structural decision

What CLT solved, what GLT solved, spans, thicknesses and why that modulation was chosen.

03

Real schedules

Engineering, fabrication and assembly, measured, not estimated.

04

Material and carbon

Timber volume, batch origin and stored carbon, with the calculation method declared.

05

Team and lessons

Practice, structural engineer, contractor, and what we would do differently next time.

CLT lifting
A·03 · Exact by nature
A·06 · ContactWe reply within 48 working hours

Is there a project under way?
Let’s talk early.

The earlier the system enters the project, the more it delivers. The ideal conversation starts at schematic design, not at tender.

Direct
hola@cambium.build
Plant
Virasoro, Corrientes
HQ
Paraguay 1535, Buenos Aires
Thank you, we received your enquiry
Something went wrong while sending the form. Please write to hola@cambium.build